Construction Porta Potty Rental in Bartlesville, OK
Job site toilets for builders, roofers, remodelers, pipeline and road crews around Bartlesville. We set units before your crew arrives, service them on a fixed weekly day and move them when the site changes.
Live answer Mon–Sat 7am–7pm · online quotes answered within 1 business hour

Construction job site: 5 quick answers
Area
All of Washington County same day; next-day to Owasso, Claremore, Skiatook and Collinsville. Gate codes and lock combos are kept on file for every service visit.
Arrival
Same day by noon; set before 7 a.m. for crew starts with notice.
Unit
Standard units with urinals; trailer-mounted units for moving crews.
Service
Weekly pump, scrub and restock; 2× weekly for crews over 10.
Billing
28-day cycles; one itemized invoice per job address. Call (918) 217-1375 for a total in under 3 minutes.
How many porta potties does OSHA require on a job site?
OSHA requires 1 toilet for 20 or fewer workers, then 1 toilet seat and 1 urinal per 40 workers, and 1 seat and 1 urinal per 50 workers once a site reaches 200 workers. That is the legal minimum under 29 CFR 1926.51(c). With weekly service, 1 unit per 10 workers keeps units usable all week.
| Workers on site | OSHA minimum (Table D-1) | Our weekly-service recommendation |
|---|---|---|
| 1–10 | 1 toilet | 1 standard unit |
| 11–20 | 1 toilet | 2 standard units |
| 21–40 | 1 seat + 1 urinal per 40 workers | 3–4 units + 1 hand washing station |
| 41–80 | 2 seats + 2 urinals | 5–8 units + 2 hand washing stations |
| 200+ | 1 seat + 1 urinal per 50 workers | 1 unit per 10 workers, service 2× weekly |
Where should a job site porta potty go?
Place a job site porta potty on level ground within a short walk of the work, at least 10 feet from fuel and away from swing paths of equipment. The service truck needs to reach it from a drive or gravel pad. Keep it out of the street and sidewalk right-of-way unless you have a city permit.
- Bartlesville right-of-way: Placing a unit in a street or sidewalk needs a Right-of-Way permit from City of Bartlesville Community Development (401 S. Johnstone Ave).
- Red clay and new lots: After rain, unpaved lots get soft. A gravel pad or plywood under the unit keeps it upright and reachable.
- Wind: On open lots west of town, we stake units during spring storm season.
- Gates: Give us the gate code or lock combo so the service tech never misses a visit.
What units do roofers, remodelers and moving crews use?
Roofers and remodelers on a 1–5 day job usually rent 1 standard unit for the driveway so workers stay out of the homeowner's house. Pipeline, fencing and road crews that move every few days rent trailer-mounted units they tow forward. Long builds take standard units plus a hand washing station.


Short job? See homeowner and remodel rentals. Long build? See monthly porta potty rentals. Size your site with the crew calculator.
Job site rental questions
Can you set the unit before my crew starts at 7 a.m.?
Units can be placed the afternoon before your start date, so they are on site when the crew pulls in. Give us the address and gate access by noon the business day before.
Do you offer contractor accounts?
Contractors with more than one job address can open an account with one monthly statement, a card or ACH on file and a single contact for every site. Ask dispatch to set it up.
Can you move a unit to a different spot on the site?
Moving a unit to a new spot on the same site is free at the regular service visit. A move between visits, or to a new address, is billed as a trip charge on your quote.
What if a unit gets tipped over by wind or equipment?
Call dispatch right away. We clean up, sanitize and replace the unit, usually the same day. Damage from equipment strikes is billed to the renter. Wind tips on staked units are not.
Can I get service twice a week?
Twice-weekly service is common for crews of 11–20 workers or for hot July and August weeks. The second visit is added to the 28-day rate on your quote.
Do you have high-rise or crane-lift units?
Crane-lift units with a lifting frame are available for multi-story commercial jobs. They need 1 week of notice. Ask dispatch about lift points and placement.
Set your job site up this week
Tell us the crew size and start date. We set units before your crew arrives.
Keep planning
OSHA porta potty requirements
Table D-1 explained with examples.
Hand washing station
OSHA 1926.51(f) handwashing.
Monthly porta potty rental
28-day billing and weekly service.
Standard porta potty
Specs, gate widths and inside features.
Porta potty rental cost
Monthly rates and service add-ons.
How many porta potties do I need?
Crew-size calculator.
Book it in one call
Call (918) 217-1375 for a delivery window and an itemized total in under 3 minutes. Lines are answered live Mon–Sat 7am–7pm. Prefer writing? Send the six-field form and you get a reply within 1 business hour.